hireejobs
Hyderabad Jobs
Banglore Jobs
Chennai Jobs
Delhi Jobs
Ahmedabad Jobs
Mumbai Jobs
Pune Jobs
Vijayawada Jobs
Gurgaon Jobs
Noida Jobs
Oil & Gas Jobs
Banking Jobs
Construction Jobs
Top Management Jobs
IT - Software Jobs
Medical Healthcare Jobs
Purchase / Logistics Jobs
Sales
Ajax Jobs
Designing Jobs
ASP .NET Jobs
Java Jobs
MySQL Jobs
Sap hr Jobs
Software Testing Jobs
Html Jobs
IT Jobs
Logistics Jobs
Customer Service Jobs
Airport Jobs
Banking Jobs
Driver Jobs
Part Time Jobs
Civil Engineering Jobs
Accountant Jobs
Safety Officer Jobs
Nursing Jobs
Civil Engineering Jobs
Hospitality Jobs
Part Time Jobs
Security Jobs
Finance Jobs
Marketing Jobs
Shipping Jobs
Real Estate Jobs
Telecom Jobs

Qc Welding Inspector

0.00 to 4.00 Years   Russia, Tambaram, Other Tamil Nadu, Chennai   22 Dec, 2021
Job LocationRussia, Tambaram, Other Tamil Nadu, Chennai
EducationNot Mentioned
SalaryRs 12 Lakh/Yr
IndustryOil & Gas / Petroleum
Functional AreaOil & Gas Engineering
EmploymentTypeFull-time

Job Description

Duties before welding

  • Verify that the material is in accordance with drawing / WPS identified and traced to a test certificate in suitable condition (free from damage and contamination)
  • WPS is approved and available to welders (and inspectors).
  • Welding equipment is in suitable condition and calibrated as appropriate.
  • Weld preparations are in accordance with WPS (and/or drawings).
  • Identification of welders qualificationfor each WPS to be used and all welder qualification certificates are valid.
  • Welding consumablesto be used are-as specified by the WPS-stored/controlled as specified by the QC procedure.
  • Joint fit-ups are in accordance with WPS / drawings
  • Tack welds are acceptable per standards, code or WPS.
  • Weld faces are free from defects, contamination, and damage.
  • The minimum temperature forPreheat (if required) is in accordance with WPS.
Duties during welding
  • Ensure weather conditions are suitable / comply with Code (conditions will not affect welding) when on-site / field welding.
  • Welding process must be in accordance with WPS.
  • Preheat (if required) minimum temperature is being maintained in accordance with WPS.
  • Inter-pass temperature maximum temperature is in accordance with WPS.
  • Welding consumables are in accordance with WPS and being controlled as the procedure.
  • Welding parameters e.g. Current, volts, travel speed are in accordance with WPS.
  • Root run is visually acceptable to Code before filling the joint (for single sided welds).
  • Gouging / grinding only allowed by an approved method and to good workmanship standard.
  • Inter-run cleaning must be at good workmanship standard.
  • The welder is on the approval register /qualified for the WPS being used.
Duties after welding
  • Each weld is marked with the welders identification and is identified in accordance with drawing/weld map.
  • Ensure welds appearance is suitable for all NDT (profile, cleanness, etc) and visually inspect welds and sentence in accordance with Code.
  • Check to ensure the dimensions are in accordance with drawing/Code.
  • Ensure any modifications are included on as-built drawings.
  • Ensure all NDT is complete and reports are available for records.
  • Monitor repair workin accordance with the procedure.
  • Monitor PWHT process (if required) for compliance with the procedure (check chart record).
  • Ensure test equipment for Pressure/load test (if required) is calibrated. Monitor test to ensure compliance with procedure/Code and ensure reports/records are available.
  • Ensure all reports/records are completed and collated as required.

Keyskills :
welding processweatherpipingtest equipmenttest certificateequipmentcompliancewpsrebuildsndtrootgrindingweldingdrawingconsumableschartfillingaustralasiainspection