hireejobs
Hyderabad Jobs
Banglore Jobs
Chennai Jobs
Delhi Jobs
Ahmedabad Jobs
Mumbai Jobs
Pune Jobs
Vijayawada Jobs
Gurgaon Jobs
Noida Jobs
Oil & Gas Jobs
Banking Jobs
Construction Jobs
Top Management Jobs
IT - Software Jobs
Medical Healthcare Jobs
Purchase / Logistics Jobs
Sales
Ajax Jobs
Designing Jobs
ASP .NET Jobs
Java Jobs
MySQL Jobs
Sap hr Jobs
Software Testing Jobs
Html Jobs
IT Jobs
Logistics Jobs
Customer Service Jobs
Airport Jobs
Banking Jobs
Driver Jobs
Part Time Jobs
Civil Engineering Jobs
Accountant Jobs
Safety Officer Jobs
Nursing Jobs
Civil Engineering Jobs
Hospitality Jobs
Part Time Jobs
Security Jobs
Finance Jobs
Marketing Jobs
Shipping Jobs
Real Estate Jobs
Telecom Jobs

General Manager To Vice President - Mechanical Cement Manufacturing.

15.00 to 24.00 Years   Jaipur   11 Feb, 2021
Job LocationJaipur
EducationNot Mentioned
SalaryRs 20 - 30 Lakh/Yr
IndustryMedical / Healthcare
Functional AreaSales / BD
EmploymentTypeFull-time

Job Description

RESPONSIBILITIES: MECHANICAL - MAINTENANCE & OPERATION

  • All types of Maintenance OF CEMENT PLANT (i.e. Pro-active, Break-downs, shutdowns and preventive & condition monitoring) of the LIMESTONE CRUSHER, STACKER & RECLAIMER, BALL MILLS FOR COAL, LIMESTONE & CLINKER GRINDING, VRMs FOR CEMENT, COAL AND RAW MILL, KILN, GRATE/CROSS BAR/CFG CLINKER COOLER, CEMENT PACKING PLANT SYSTEM & Clinker & Coal transport system.
  • 24x7 Works in a manufacturing plant environment with possible exposer to dusty, loud, hot or cold, and changing environments.
  • Directly supervises maintenance supervisors and engineering staff, with next-level maintenance employees reporting through supervisors.
  • Major/minor Shutdown planning as per the requirement of plant and management.
  • Plant availability and cost control.
  • Cost reduction in spares and consumables
  • Harmonious Coordination with the process, instrument, and electrical people to enhance productivity.
  • Skilled Upward & downward reporting.
  • Team development by giving internal training down the line/sub-ordinates.
  • Reduction in energy {power & fuel}, lubrication & hydraulic oil & spare consumption.
  • Hydraulic & Pneumatic circuit maintenance.
  • Condition-based Preventive Maintenance System.
  • Material management, Indenting, Inventory control, Standardization, and Waste control.
  • Project planning, layout, execution, and scheduling.
  • Manpower management
  • Emission level control under factory act & norms.
  • To plan shutdown jobs and materials in such a way so that plant availability may increase.
  • Follow-up with purchase Dept. / Supplier.
  • Prepares and monitors Budget for adherence of the departments.
  • Spare parts planning and inventory control.
  • ISO documentation.
  • Ensuring compliance with internal safety norms.
Shutdown Maintenance for three Kiln lines, starting from Lime Stone Crusher to Clinker Stoke Pile.
  • Responsible for Resource Management of Kiln Shutdowns, related to all stakeholders, i.e. Mechanical, Production, E&I, Civil, and other auxiliary departments.
  • Responsible to manage and execute all 5 phases of Kiln shutdown as per LH guideline (i.e. Planning, Scheduling, Preparation, Execution, and Analysis & Learnings)
  • Responsible to complete the shutdown within the planned budget and analyzing to reduce the shutdown cost and duration by brainstorming and implementation various best practices.
  • Preparation of shutdown budget in terms of shutdown days and cost.
  • Planning and execution of shell and major component replacement activities related to all three Kilns with updated history records.
Maintenance Cost Budgeting
  • Responsible for Maintenance cost Budgeting (All three Lines from Crusher to Packing Plant)
  • Preparation of annual maintenance cost budget
  • Ensure Execution of all maintenance activities within the approved budget by tracking cost every month
  • Responsible for implementation of various new maintenance management projects initiated by LH.
Capex Planning
  • Responsible for Capex budget finalization for Maintenance Activities.
  • Responsible for Maintenance Capex planning and completion within the approved budget and timeline
  • Monthly/Weekly maintenance CAPEX tracking and reporting
  • All modification and rectification work during erection of equipment. Replacement of bearings of coal mill VRM supplied by Gebr. Pfeiffer, Germany had been executed under my supervision.
  • Planning effective manpower deployment for erection/commissioning works and addressing the training of staff to enhance skills and productivity.
  • Planning of day to day erection activities, achieving weekly and monthly targets, and coordination with contractors for achieving the same.
  • Indenting of spares through SAP and inventory control. Preservation of all spares.
  • Maximum utilization of men, equipment, and resources.
  • Troubleshooting daily technical problems and doing Root Cause Analysis of chronic problems
,

Keyskills :
maintenance activitiesroot cause analysisltdresource managementequipment supplymaintenance managementpreventive maintenancecoaldeliveryproject managementroot causecost controlautomationinventory controlcontinuous improvement facilitationsap

General Manager To Vice President - Mechanical Cement Manufacturing. Related Jobs

© 2019 Hireejobs All Rights Reserved